The painters followed closely on the heels of the sheet rock guys.  A lot of spackle and sanding and then up goes the paint!  We’ve tried to keep the color scheme simple, peaceful and beautiful – lots of soft greys and some splashes of blue to keep it interesting!

Light fixtures just started to appear in the past couple of days.  And today, the kitchen cabinets were installed and installation of the elevator is beginning.  Lots of progress!

We are trying our best to pin down our moving dates and dates for the dedication of our building.  We’ll keep you posted as soon as we know more!

January 26 2016-8

Kitchen cabinet installation

January 26 2016-11

First floor gallery seating area by the fireplace

January 26 2016-19

Sanctuary prior to painting. The cantilevered wall with the slits is the Memorial Room upstairs

January 26 2016-39

View from inside the Memorial Room. The window slits connect you with the sanctuary

January 26 2016-24

Upstairs large multi-purpose room – a splash of blue livens it up!

January 26 2016-33

Second floor small multi-purpose room

January 26 2016-31

The work to assemble and install the elevator begins